Exterior Construction ViewsThis series shows the exterior of the house in various stages of construction.
| ||
![]() Laying the Logs Click to Enlarge |
The base logs are laid in place above the Radon Barrier and on top of the foundations. | |
![]() Front Exterior Click to Enlarge |
Most of the logs are in place now and temporary supports are used until the main ridge beams are loaded into place. | |
![]() Flying Ridge Beams Click to Enlarge |
The crane lifts the laminated ridge beams and the team fits them into place. | |
![]() Flying Trusses Click to Enlarge |
The massive decorative trusses are lifted into place above the living area by the crane. | |
![]() Site View during Construction Click to Enlarge |
A view from the entrance showing the scale of the house after the log construction has completed. | |
![]() Snowy Rafters Click to Enlarge |
A light fall of snow rests on the rafters as the roof structure gets underway. | |
![]() Side View Click to Enlarge |
The side gables are complete and one of the ridge beams are in place. | |
![]() Front View of the left side Click to Enlarge |
The snow melts off the rafters and shows the excellent quality of the timber in the structure. | |
![]() Rear View Click to Enlarge |
This view of the back of the house shows the rear veranda area, the main ridge beams and rafters. | |
![]() Front view of the right side Click to Enlarge |
The main entrance and upstairs balcony show the attractive design of the home. | |
![]() Rear Bedroom View Click to Enlarge |
The roof area has been covered and battened awaiting the roof tiles. | |
![]() Rear View Click to Enlarge |
Work on the roof continues. | |
![]() Rear Bay Window Click to Enlarge |
The Bay Window area at the back of the house shows the bright interior and good use of light in this design. | |