Exterior Construction Views

This series shows the exterior of the house in various stages of construction.



Laying the Logs
Click to Enlarge
The base logs are laid in place above the Radon Barrier and on top of the foundations.

Front Exterior
Click to Enlarge
Most of the logs are in place now and temporary supports are used until the main ridge beams are loaded into place.

Flying Ridge Beams
Click to Enlarge
The crane lifts the laminated ridge beams and the team fits them into place.

Flying Trusses
Click to Enlarge
The massive decorative trusses are lifted into place above the living area by the crane.

Site View during Construction
Click to Enlarge
A view from the entrance showing the scale of the house after the log construction has completed.

Snowy Rafters
Click to Enlarge
A light fall of snow rests on the rafters as the roof structure gets underway.

Side View
Click to Enlarge
The side gables are complete and one of the ridge beams are in place.

Front View of the left side
Click to Enlarge
The snow melts off the rafters and shows the excellent quality of the timber in the structure.

Rear View
Click to Enlarge
This view of the back of the house shows the rear veranda area, the main ridge beams and rafters.

Front view of the right side
Click to Enlarge
The main entrance and upstairs balcony show the attractive design of the home.

Rear Bedroom View
Click to Enlarge
The roof area has been covered and battened awaiting the roof tiles.

Rear View
Click to Enlarge
Work on the roof continues.

Rear Bay Window
Click to Enlarge
The Bay Window area at the back of the house shows the bright interior and good use of light in this design.