Interior ConstructionThis collection of photographs shows interior construction details. Note that the photos are shown in most recent order.
| ||
![]() Shower Room Tiles Click to Enlarge |
The tiling of the downstairs bathroom (and adjacent sauna room) has been completed. | |
![]() Inside a Bedroom Click to Enlarge |
One of the upstairs bedrooms has been floored and the first layer of protective varnish has been applied. | |
![]() Flooring the upstairs Click to Enlarge |
The upstairs balcony, sealed at the customer's request, has been panelled and the floorboards are laid. | |
![]() Plumbing and Wiring Click to Enlarge |
The plumbing and wiring is laid out in the insulation wall before final panelling. | |
![]() Upstairs Bedroom Click to Enlarge |
The upstairs bedroom is given character by the roof and light from the dormer windows. | |
![]() Second Floor Lighting Click to Enlarge |
The spacious upper interior is well lit with natural light. | |
![]() Joists in main bedroom Click to Enlarge |
The joists are measured and braced to support the floor boards which will be laid shortly. | |
![]() Living Room Ceiling Click to Enlarge |
The Ceiling Panels are in place between the upper floor joists and the beams of the living room. | |
![]() Ceiling View Click to Enlarge |
A look at the ceiling in the ground floor office. | |
![]() Living Room Click to Enlarge |
This shows the view from inside the living room out to the verandah area. We will be removing the window to extend the room size. | |
![]() Early Wall Detail Click to Enlarge |
Side view showing the kitchen with space for the double doors. | |
![]() Early Wall Detail Click to Enlarge |
Detail of the log walls showing how the logs fit together during construction. | |